53,000 ± net mineral acres owned in fee beneath 112,000 gross acres of Union Pacific railroad checkerboard — on the Colorado–Wyoming line, and north of Cheyenne.
A severed fee mineral estate. Senator Francis E. Warren began assembling it in 1883 from the Union Pacific Railroad; it passed whole to one family in 1963 and has never been offered entire. Four fields on and around it have produced roughly 116 million barrels, the northern DJ just south another 142 million. Sixty-one wells pay royalty into it today, and about ninety percent is open — no lease in force.
It conveys as one block, to one buyer, in a single closing.
Nearly every prospect on a NAPE floor is leasehold. The generator took leases, worked up the idea, and sells before the primary term runs — so what changes hands is a three- or five-year right to drill in one depth window, carrying twenty to twenty-five percent royalty. If the acreage is held by production, the clock is gone only because somebody else drilled the well that holds it, and operates it. A clock, or a landlord.
The minerals themselves. 53,000 net acres in fee — no primary term, no delay rentals, no Pugh clause, no continuous development obligation, nothing to renew. All depths. Non-cost-bearing: no AFEs, no cash calls. No lessor to pay — nineteen percent kept on every barrel from the owned share, after the 5% non-participating royalty the seller reserves at closing. And on ninety percent of it, no operator ahead of you.
Some of it is landed on the estate itself and arrives as royalty without the buyer spending a dollar. The rest is on acreage that touches it, and none of that is credited in the price.
NAPE Summit 2027, Houston, 3–5 February. Prospect Hub — Minerals & Royalties theatre. I can put your people into the data room the same week, or walk the ground with you afterwards.
Download the five-page summary PDF · 14 MB